[{"data":1,"prerenderedAt":139},["ShallowReactive",2],{"blog-post-fast-supply-for-contractors-en":3},{"id":4,"title":5,"author":6,"body":7,"date":127,"description":128,"draft":129,"extension":130,"image":131,"meta":132,"navigation":133,"path":134,"seo":135,"stem":136,"summary":137,"__hash__":138},"blog_en\u002Fblog\u002Fen\u002Ffast-supply-for-contractors.md","Fast Kitchen Cabinet Supply for Contractors: Modular Systems and Flat-Pack","Rubino Sales",{"type":8,"value":9,"toc":118},"minimark",[10,19,24,35,39,46,74,78,85,89,96,100],[11,12,13,14,18],"p",{},"On multi-unit residential projects, the kitchen is often the ",[15,16,17],"strong",{},"bottleneck"," in the delivery schedule. As measuring, bespoke production and assembly drag on, the handover date slips. A modular cabinet system changes that equation.",[20,21,23],"h2",{"id":22},"_57-working-days-on-standard-models","5–7 working days on standard models",[11,25,26,27,30,31,34],{},"Rubino catalogue modules are produced on a ",[15,28,29],{},"stock logic",". For standard configurations the delivery time is ",[15,32,33],{},"5–7 working days",". Custom orders extend to 15–25 working days depending on volume — but because most of a project's backbone can be built from standard modules, the schedule stays predictable.",[20,36,38],{"id":37},"the-logistics-advantage-of-flat-pack","The logistics advantage of flat-pack",[11,40,41,42,45],{},"Modules ship ",[15,43,44],{},"flat-pack",", palletised. On site this means:",[47,48,49,56,62,68],"ul",{},[50,51,52,55],"li",{},[15,53,54],{},"Lower freight"," — far more units fit on the same truck",[50,57,58,61],{},[15,59,60],{},"Less transit damage"," — lower corner-impact risk than assembled bodies",[50,63,64,67],{},[15,65,66],{},"Easy vertical handling"," — through lifts and stairwells without trouble",[50,69,70,73],{},[15,71,72],{},"Stackable"," storage on the job site",[20,75,77],{"id":76},"predictable-ordering-by-catalogue-code","Predictable ordering by catalogue code",[11,79,80,81,84],{},"Every module has an ",[15,82,83],{},"order code"," and a fixed dimension. That standardises the order list across repeating units and reduces revisions and error margins. The architecture office uses the same code set across every block.",[20,86,88],{"id":87},"volume-based-pricing","Volume-based pricing",[11,90,91,92,95],{},"Project-quantity orders are quoted on ",[15,93,94],{},"volume-based pricing",". Standard Häfele hardware and the E1-certified 18 mm body are included in the price — no surprise line items.",[20,97,99],{"id":98},"how-to-start","How to start",[11,101,102,103,106,107,112,113,117],{},"The fastest response is on WhatsApp with your project list and quantities: ",[15,104,105],{},"+90 549 290 0654",". You can also start the process from the ",[108,109,111],"a",{"href":110},"\u002Fen\u002Fbecome-a-dealer","dealer & project application page"," and review module dimensions in the ",[108,114,116],{"href":115},"\u002Fcatalogues\u002Frubino-katalog-2026.pdf","2026 catalogue",".",{"title":119,"searchDepth":120,"depth":120,"links":121},"",2,[122,123,124,125,126],{"id":22,"depth":120,"text":23},{"id":37,"depth":120,"text":38},{"id":76,"depth":120,"text":77},{"id":87,"depth":120,"text":88},{"id":98,"depth":120,"text":99},"2026-05-12","On multi-unit residential projects, the kitchen is often the bottleneck in the delivery schedule. As measuring, bespoke production and assembly drag on, the handover date slips. A modular cabinet system changes that equation.",false,"md","\u002Fimages\u002Fspecs\u002Fpackaging.jpg",{},true,"\u002Fblog\u002Fen\u002Ffast-supply-for-contractors",{"title":5,"description":128},"blog\u002Fen\u002Ffast-supply-for-contractors","5–7 working days on standard models, flat-pack shipping and volume-based pricing — how a modular cabinet system speeds up the project schedule.","nQvcLmT5z-509SwQHptAHRyr7ywlF5yQunntlhrige4",1786727533621]